top of page
Site 4 = Eastford 66MW
(pre-application completed)
Forth site (Eastford) Owner = Anesco (same as site 2)
(This is basically an extension of site 2 that will use the same track, but is located in the field next door)
Physical Size = ?unknown?
When Planning went in = received 15/10/2024 (published 15/01/25)
Planning Approved = no (Pre application complete)
Whats Next =??
Time line for construction = ??
How long lease period = ??
Power Output = 66MW Capacity
Energy Consents Unit reference = ECU00006006 - Pre Application Complete, decision = Non-EIA 12 Feb 2025

bottom of page